Resolved: Scheduled Power Shutdown at Sparks, Schwab, Willard East, Burrowes, Pond, Mueller, and Oswald Buildings on March 14, 2015

OPP has scheduled an electrical service shutdown at Sparks, Schwab, Willard East, and Burrowes Buildings on March 14, 2015, from 7:00am to 9:00am.
The have also scheduled an electrical service shutdown at Pond, Mueller, and Oswald Buildings on March 14, 2015, from 7:00am to 10:00am.

CLC labs and service in these locations may not be available during these times.

More information: Resolved: Scheduled Power Shutdown at Sparks, Schwab, Willard East, Burrowes, Pond, Mueller, and Oswald Buildings on March 14, 2015

Story added 16. March 2015, content source with full text you can find at link above.